Drivers are in for further congestion on the A27 as roadworks on the Adur flyover outside Shoreham switch to the other side.

There have been long delays on the westbound side of the road. From tomorrow morning the work changes to the eastbound side.

The Highways Agency is strengthening the flyover surface as well as refurbishing the bridge joints in preparation for major strengthening work due to start in mid April.

These works, which will close one lane of the road from the Sussex Pad lights to the east end of the flyover, are set to last for two weeks.